RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3113034639 - Archived data from Tue, 11. August 2020 18:01:00 CEST


This is all the information about APD 3113034639. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3113034639
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.2 V
Dark current: 14.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 42
EP1 batch: 146
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.9735391 V     T = -25 °C: 339.8446493 V
Voltage for Gain 150: T = +20 °C: 381.8479272 V     T = -25 °C: 347.0413259 V
Voltage for Gain 200: T = +20 °C: 386.256435 V     T = -25 °C: 351.0936466 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.59954039 V-1     T = -25 °C: 5.107546394 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.989609075 V-1     T = -25 °C: 9.600448112 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.8442258 V-1     T = -25 °C: 15.24432959 V-1
Break-through voltage: T = +20 °C: 402.343634 V     T = -25 °C: 366.3777959 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:10 CET jreher Updated box and position via API.
11. Aug 2020 18:01:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:37 CEST jreher Updated APD location via API.
28. Jan 2020 16:17:08 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:03 CET jreher Updated APD location via API.
27. Nov 2019 19:51:46 CET jreher Updated APD location via API.
25. Nov 2019 17:21:17 CET jreher Updated box and position via API.
03. Sep 2019 11:34:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:47 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:14 CEST Tobias Imported from Hamamatsu datasheet.