RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3113034613 - Archived data from Tue, 11. August 2020 18:00:55 CEST


This is all the information about APD 3113034613. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3113034613
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.6 V
Dark current: 18.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 18
EP1 batch: 145
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.0860265 V     T = -25 °C: 340.6574001 V
Voltage for Gain 150: T = +20 °C: 382.9013101 V     T = -25 °C: 347.8774327 V
Voltage for Gain 200: T = +20 °C: 387.272697 V     T = -25 °C: 351.9411872 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615916236 V-1     T = -25 °C: 4.772895516 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.062953633 V-1     T = -25 °C: 9.793791494 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.00895716 V-1     T = -25 °C: 15.60756506 V-1
Break-through voltage: T = +20 °C: 402.7086838 V     T = -25 °C: 366.9036007 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:08 CET jreher Updated box and position via API.
11. Aug 2020 18:00:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:35 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:01 CET jreher Updated APD location via API.
27. Nov 2019 19:51:44 CET jreher Updated APD location via API.
25. Nov 2019 17:21:15 CET jreher Updated box and position via API.
03. Sep 2019 11:34:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:47 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:13 CEST Tobias Imported from Hamamatsu datasheet.