RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3112034592 - Archived data from Tue, 11. August 2020 18:00:53 CEST


This is all the information about APD 3112034592. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3112034592
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 401 V
Voltage for Gain 100 (T=+25°C): 374.7 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 9
EP1 batch: 145
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.3939008 V     T = -25 °C: 339.8871558 V
Voltage for Gain 150: T = +20 °C: 382.193934 V     T = -25 °C: 347.0878775 V
Voltage for Gain 200: T = +20 °C: 386.5617574 V     T = -25 °C: 351.1410251 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.529438323 V-1     T = -25 °C: 5.082418491 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.81664565 V-1     T = -25 °C: 9.612285362 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2877822 V-1     T = -25 °C: 15.29716594 V-1
Break-through voltage: T = +20 °C: 402.2256813 V     T = -25 °C: 366.3592344 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:07 CET jreher Updated box and position via API.
11. Aug 2020 18:00:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:34 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:01 CET jreher Updated APD location via API.
27. Nov 2019 19:51:44 CET jreher Updated APD location via API.
25. Nov 2019 17:21:14 CET jreher Updated box and position via API.
03. Sep 2019 11:34:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:46 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:13 CEST Tobias Imported from Hamamatsu datasheet.