Subdetector specification:  
Serial: 3111034529
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 22.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 129
Position in Box: 13
EP1 batch: 144
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.8590146 V     T = -25 °C: 342.3902219 V
Voltage for Gain 150: T = +20 °C: 384.6246038 V     T = -25 °C: 349.7004799 V
Voltage for Gain 200: T = +20 °C: 389.0712605 V     T = -25 °C: 353.7882172 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.7143759 V-1     T = -25 °C: 4.86540353 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.282030169 V-1     T = -25 °C: 9.975647411 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.448861 V-1     T = -25 °C: 15.99853762 V-1
Break-through voltage: T = +20 °C: 404.3397425 V     T = -25 °C: 368.6100553 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:18:48 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:17 CET jreher Updated box and position via API.
05. Feb 2021 11:05:00 CET jreher Updated box and position via API.
11. Aug 2020 18:07:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:30 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:57 CET jreher Updated APD location via API.
27. Nov 2019 19:51:33 CET jreher Updated APD location via API.
25. Nov 2019 17:21:10 CET jreher Updated box and position via API.
03. Sep 2019 11:34:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:44 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:12 CEST Tobias Imported from Hamamatsu datasheet.