RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3111034528 - Archived data from Tue, 11. August 2020 18:07:55 CEST


This is all the information about APD 3111034528. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3111034528
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 21.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 129
Position in Box: 12
EP1 batch: 144
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.2869297 V     T = -25 °C: 342.7420534 V
Voltage for Gain 150: T = +20 °C: 385.1306041 V     T = -25 °C: 350.010399 V
Voltage for Gain 200: T = +20 °C: 389.5931057 V     T = -25 °C: 354.1217942 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585638389 V-1     T = -25 °C: 4.755447158 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.797920005 V-1     T = -25 °C: 9.636250481 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.83999611 V-1     T = -25 °C: 15.15955694 V-1
Break-through voltage: T = +20 °C: 404.3895735 V     T = -25 °C: 368.6705175 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:59 CET jreher Updated box and position via API.
11. Aug 2020 18:07:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:30 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:57 CET jreher Updated APD location via API.
27. Nov 2019 19:51:33 CET jreher Updated APD location via API.
25. Nov 2019 17:21:10 CET jreher Updated box and position via API.
03. Sep 2019 11:34:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:44 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:12 CEST Tobias Imported from Hamamatsu datasheet.