RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3110034519 - Archived data from Tue, 11. August 2020 18:07:55 CEST


This is all the information about APD 3110034519. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3110034519
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 375.8 V
Dark current: 18.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 129
Position in Box: 9
EP1 batch: 144
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.8992855 V     T = -25 °C: 341.1372865 V
Voltage for Gain 150: T = +20 °C: 383.670953 V     T = -25 °C: 348.3989716 V
Voltage for Gain 200: T = +20 °C: 388.060281 V     T = -25 °C: 352.4836118 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612786355 V-1     T = -25 °C: 4.912260152 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.390009348 V-1     T = -25 °C: 9.300387023 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92612287 V-1     T = -25 °C: 16.6008913 V-1
Break-through voltage: T = +20 °C: 403.7496416 V     T = -25 °C: 367.8784529 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:59 CET jreher Updated box and position via API.
11. Aug 2020 18:07:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:30 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:57 CET jreher Updated APD location via API.
27. Nov 2019 19:51:33 CET jreher Updated APD location via API.
25. Nov 2019 17:21:09 CET jreher Updated box and position via API.
03. Sep 2019 11:34:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:44 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:12 CEST Tobias Imported from Hamamatsu datasheet.