RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3110034482 - Archived data from Tue, 11. August 2020 17:53:49 CEST


This is all the information about APD 3110034482. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3110034482
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 21.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 128
Position in Box: 31
EP1 batch: 143
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4784288 V     T = -25 °C: 346.4621872 V
Voltage for Gain 150: T = +20 °C: 389.3685513 V     T = -25 °C: 353.8581847 V
Voltage for Gain 200: T = +20 °C: 393.7596641 V     T = -25 °C: 358.01948 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.440601499 V-1     T = -25 °C: 4.796463216 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.578945741 V-1     T = -25 °C: 9.584466749 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.7643209 V-1     T = -25 °C: 15.1138403 V-1
Break-through voltage: T = +20 °C: 406.7273884 V     T = -25 °C: 371.4039395 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:54 CET jreher Updated box and position via API.
11. Aug 2020 17:53:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:27 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:55 CET jreher Updated APD location via API.
27. Nov 2019 19:51:24 CET jreher Updated APD location via API.
25. Nov 2019 17:21:06 CET jreher Updated box and position via API.
03. Sep 2019 11:33:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:43 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:11 CEST Tobias Imported from Hamamatsu datasheet.