RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3108034384 - Archived data from Fri, 18. December 2020 13:59:54 CET


This is all the information about APD 3108034384. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3108034384
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 19.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 15
EP1 batch: 141
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2584464 V     T = -25 °C: 344.4967875 V
Voltage for Gain 150: T = +20 °C: 387.1023892 V     T = -25 °C: 351.7768729 V
Voltage for Gain 200: T = +20 °C: 391.4792235 V     T = -25 °C: 355.8706926 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502159905 V-1     T = -25 °C: 4.78668445 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.789944662 V-1     T = -25 °C: 9.785057556 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36197413 V-1     T = -25 °C: 15.53483269 V-1
Break-through voltage: T = +20 °C: 406.9471788 V     T = -25 °C: 370.9730311 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:13 CET jreher Assigned to capsule by script
05. Feb 2021 11:04:45 CET jreher Updated box and position via API.
18. Dec 2020 13:59:54 CET jreher Updated box and position via API.
11. Aug 2020 17:53:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:21 CEST jreher Updated APD location via API.
09. Dec 2019 18:18:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:50 CET jreher Updated APD location via API.
27. Nov 2019 19:51:11 CET jreher Updated APD location via API.
25. Nov 2019 17:21:00 CET jreher Updated box and position via API.
03. Sep 2019 11:32:43 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:41 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:59 CEST Tobias Imported from Hamamatsu datasheet.