RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3107034360 - Archived data from Fri, 05. February 2021 11:04:43 CET


This is all the information about APD 3107034360. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3107034360
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 20 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 2
EP1 batch: 140
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8514316 V     T = -25 °C: 345.4765581 V
Voltage for Gain 150: T = +20 °C: 388.6237611 V     T = -25 °C: 352.7954424 V
Voltage for Gain 200: T = +20 °C: 392.9338864 V     T = -25 °C: 356.9086877 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.651779402 V-1     T = -25 °C: 4.760740275 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.315424829 V-1     T = -25 °C: 9.625871549 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58593834 V-1     T = -25 °C: 15.28254724 V-1
Break-through voltage: T = +20 °C: 407.7225826 V     T = -25 °C: 371.58814 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:22:17 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:18 CET jreher Updated box and position via API.
05. Feb 2021 11:04:43 CET jreher Updated box and position via API.
11. Aug 2020 17:53:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:20 CEST jreher Updated APD location via API.
09. Dec 2019 18:18:26 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:49 CET jreher Updated APD location via API.
27. Nov 2019 19:51:10 CET jreher Updated APD location via API.
25. Nov 2019 17:20:59 CET jreher Updated box and position via API.
03. Sep 2019 11:32:18 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:16 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:41 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:58 CEST Tobias Imported from Hamamatsu datasheet.