RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3107034308 - Archived data from Tue, 11. August 2020 17:53:26 CEST


This is all the information about APD 3107034308. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3107034308
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 19.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 126
Position in Box: 19
EP1 batch: 139
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0076109 V     T = -25 °C: 344.8676051 V
Voltage for Gain 150: T = +20 °C: 387.8007591 V     T = -25 °C: 352.119363 V
Voltage for Gain 200: T = +20 °C: 392.1234284 V     T = -25 °C: 356.2022368 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.65272513 V-1     T = -25 °C: 5.092449393 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.260285387 V-1     T = -25 °C: 9.564067457 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52421976 V-1     T = -25 °C: 15.24486386 V-1
Break-through voltage: T = +20 °C: 406.7284066 V     T = -25 °C: 370.5734993 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:03 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:30 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:04:38 CET jreher Updated box and position via API.
11. Aug 2020 17:53:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:17 CEST jreher Updated APD location via API.
09. Dec 2019 18:18:59 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:46 CET jreher Updated APD location via API.
27. Nov 2019 19:51:00 CET jreher Updated APD location via API.
25. Nov 2019 17:20:56 CET jreher Updated box and position via API.
03. Sep 2019 11:31:51 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:40 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:58 CEST Tobias Imported from Hamamatsu datasheet.