RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3106034288 - Archived data from Thu, 15. April 2021 17:01:30 CEST


This is all the information about APD 3106034288. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3106034288
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.4 V
Dark current: 19.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 125
Position in Box: 50
EP1 batch: 138
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.8397139 V     T = -25 °C: 341.4655895 V
Voltage for Gain 150: T = +20 °C: 383.6850562 V     T = -25 °C: 348.656901 V
Voltage for Gain 200: T = +20 °C: 388.0665643 V     T = -25 °C: 352.6906257 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.659242767 V-1     T = -25 °C: 4.879682159 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.209395945 V-1     T = -25 °C: 10.08028874 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32891491 V-1     T = -25 °C: 16.25293827 V-1
Break-through voltage: T = +20 °C: 404.0748611 V     T = -25 °C: 367.9460159 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:09:45 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:30 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:33 CET jreher Updated box and position via API.
11. Aug 2020 17:53:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:15 CEST jreher Updated APD location via API.
09. Dec 2019 18:19:37 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:45 CET jreher Updated APD location via API.
27. Nov 2019 19:50:52 CET jreher Updated APD location via API.
25. Nov 2019 17:20:53 CET jreher Updated box and position via API.
03. Sep 2019 11:31:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:39 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:58 CEST Tobias Imported from Hamamatsu datasheet.