RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3106034262 - Archived data from Tue, 11. August 2020 17:53:18 CEST


This is all the information about APD 3106034262. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3106034262
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 15.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 125
Position in Box: 27
EP1 batch: 138
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6089478 V     T = -25 °C: 345.6718227 V
Voltage for Gain 150: T = +20 °C: 388.4513454 V     T = -25 °C: 352.9846564 V
Voltage for Gain 200: T = +20 °C: 392.8061647 V     T = -25 °C: 357.1132058 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.39096545 V-1     T = -25 °C: 5.063667421 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.354865964 V-1     T = -25 °C: 9.44236595 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57186996 V-1     T = -25 °C: 14.79170597 V-1
Break-through voltage: T = +20 °C: 407.6756487 V     T = -25 °C: 371.7334763 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:22:18 CET jreher Assigned to capsule by script
05. Feb 2021 11:04:31 CET jreher Updated box and position via API.
18. Dec 2020 14:00:20 CET jreher Updated box and position via API.
11. Aug 2020 17:53:18 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:13 CEST jreher Updated APD location via API.
09. Dec 2019 18:20:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:43 CET jreher Updated APD location via API.
27. Nov 2019 19:50:50 CET jreher Updated APD location via API.
25. Nov 2019 17:20:52 CET jreher Updated box and position via API.
03. Sep 2019 11:31:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:38 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:57 CEST Tobias Imported from Hamamatsu datasheet.