RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034195 - Archived data from Fri, 05. February 2021 11:04:22 CET


This is all the information about APD 3105034195. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034195
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 17.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 124
Position in Box: 20
EP1 batch: 136
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5373595 V     T = -25 °C: 347.0564919 V
Voltage for Gain 150: T = +20 °C: 390.3221256 V     T = -25 °C: 354.3341895 V
Voltage for Gain 200: T = +20 °C: 394.6362524 V     T = -25 °C: 358.4213488 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.467105822 V-1     T = -25 °C: 4.950421156 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.773153424 V-1     T = -25 °C: 9.309543307 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32505118 V-1     T = -25 °C: 16.63822754 V-1
Break-through voltage: T = +20 °C: 409.7099181 V     T = -25 °C: 373.3122483 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:01 CET jreher Updated box and position via API.
15. Feb 2021 15:37:18 CET jreher Assigned to capsule by script
05. Feb 2021 11:04:22 CET jreher Updated box and position via API.
11. Aug 2020 18:07:48 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:08 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:39 CET jreher Updated APD location via API.
27. Nov 2019 19:50:39 CET jreher Updated APD location via API.
25. Nov 2019 17:20:46 CET jreher Updated box and position via API.
30. Aug 2019 11:32:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:37 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:56 CEST Tobias Imported from Hamamatsu datasheet.