RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034162 - Archived data from Mon, 15. February 2021 15:40:04 CET


This is all the information about APD 3105034162. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034162
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3105034162/2808031396
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 123
Position in Box: 45
EP1 batch: 135
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5462233 V     T = -25 °C: 347.7816884 V
Voltage for Gain 150: T = +20 °C: 391.2540832 V     T = -25 °C: 355.1534794 V
Voltage for Gain 200: T = +20 °C: 395.526017 V     T = -25 °C: 359.29211 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.512420994 V-1     T = -25 °C: 5.051201266 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.109275129 V-1     T = -25 °C: 9.375799386 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42198719 V-1     T = -25 °C: 14.86332512 V-1
Break-through voltage: T = +20 °C: 409.5296942 V     T = -25 °C: 373.4726446 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:44 CET jreher Updated box and position via API.
15. Feb 2021 15:40:04 CET jreher Assigned to capsule by script
05. Feb 2021 11:04:17 CET jreher Updated box and position via API.
11. Aug 2020 18:07:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:05 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:41 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:37 CET jreher Updated APD location via API.
27. Nov 2019 19:50:30 CET jreher Updated APD location via API.
25. Nov 2019 17:20:43 CET jreher Updated box and position via API.
30. Aug 2019 11:31:26 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:36 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:56 CEST Tobias Imported from Hamamatsu datasheet.