RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034126 - Archived data from Tue, 11. August 2020 18:07:41 CEST


This is all the information about APD 3104034126. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034126
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.7 V
Dark current: 13.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 31
EP1 batch: 135
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.0870218 V     T = -25 °C: 340.9248011 V
Voltage for Gain 150: T = +20 °C: 383.7761765 V     T = -25 °C: 348.0917678 V
Voltage for Gain 200: T = +20 °C: 388.0680037 V     T = -25 °C: 352.1291182 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.480739557 V-1     T = -25 °C: 5.099344721 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.446184547 V-1     T = -25 °C: 9.600954528 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89876187 V-1     T = -25 °C: 15.29288373 V-1
Break-through voltage: T = +20 °C: 403.640329 V     T = -25 °C: 367.2481768 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:16 CET jreher Updated box and position via API.
11. Aug 2020 18:07:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:04 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:40 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:36 CET jreher Updated APD location via API.
27. Nov 2019 19:50:29 CET jreher Updated APD location via API.
25. Nov 2019 17:20:42 CET jreher Updated box and position via API.
30. Aug 2019 11:31:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:35 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.