RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034123 - Archived data from Fri, 05. February 2021 11:04:15 CET


This is all the information about APD 3104034123. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034123
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.4 V
Dark current: 13.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 28
EP1 batch: 135
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.0875277 V     T = -25 °C: 341.8211298 V
Voltage for Gain 150: T = +20 °C: 384.8197345 V     T = -25 °C: 349.0415374 V
Voltage for Gain 200: T = +20 °C: 389.1704273 V     T = -25 °C: 353.1101615 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.780500213 V-1     T = -25 °C: 5.109963782 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.074117617 V-1     T = -25 °C: 9.615510182 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88774324 V-1     T = -25 °C: 15.28186309 V-1
Break-through voltage: T = +20 °C: 405.655288 V     T = -25 °C: 368.0630166 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:17:13 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:55 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:15 CET jreher Updated box and position via API.
11. Aug 2020 18:07:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:04 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:40 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:36 CET jreher Updated APD location via API.
27. Nov 2019 19:50:28 CET jreher Updated APD location via API.
25. Nov 2019 17:20:42 CET jreher Updated box and position via API.
30. Aug 2019 11:31:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:35 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.