RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3104034092 - Archived data from Wed, 16. June 2021 15:52:53 CEST


This is all the information about APD 3104034092. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3104034092
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 11.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 123
Position in Box: 1
EP1 batch: 134
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4348721 V     T = -25 °C: 346.0176994 V
Voltage for Gain 150: T = +20 °C: 389.2712974 V     T = -25 °C: 353.3721721 V
Voltage for Gain 200: T = +20 °C: 393.6284374 V     T = -25 °C: 357.5222565 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.462807735 V-1     T = -25 °C: 4.949062215 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.770200339 V-1     T = -25 °C: 9.135384788 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29973899 V-1     T = -25 °C: 16.23507491 V-1
Break-through voltage: T = +20 °C: 408.7311453 V     T = -25 °C: 372.5445866 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:42:40 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:57 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:12 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:13 CET jreher Updated box and position via API.
11. Aug 2020 18:07:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:01 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:34 CET jreher Updated APD location via API.
27. Nov 2019 19:50:26 CET jreher Updated APD location via API.
25. Nov 2019 17:20:40 CET jreher Updated box and position via API.
30. Aug 2019 11:30:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:34 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:55 CEST Tobias Imported from Hamamatsu datasheet.