RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034040 - Archived data from Mon, 10. May 2021 14:02:12 CEST


This is all the information about APD 3103034040. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034040
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 122
Position in Box: 18
EP1 batch: 133
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.830314 V     T = -25 °C: 348.9776525 V
Voltage for Gain 150: T = +20 °C: 391.6543416 V     T = -25 °C: 356.2627249 V
Voltage for Gain 200: T = +20 °C: 395.9885656 V     T = -25 °C: 360.4827501 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.652524101 V-1     T = -25 °C: 5.345641713 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.259915106 V-1     T = -25 °C: 9.967757364 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48273436 V-1     T = -25 °C: 16.47613467 V-1
Break-through voltage: T = +20 °C: 411.958635 V     T = -25 °C: 375.5198457 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:59:02 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:02:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:07 CET jreher Updated box and position via API.
11. Aug 2020 18:00:46 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:59 CEST jreher Updated APD location via API.
28. Jan 2020 16:13:56 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:31 CET jreher Updated APD location via API.
27. Nov 2019 19:50:17 CET jreher Updated APD location via API.
25. Nov 2019 17:20:36 CET jreher Updated box and position via API.
30. Aug 2019 11:30:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:33 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.