RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103034001 - Archived data from Fri, 05. February 2021 11:04:01 CET


This is all the information about APD 3103034001. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103034001
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 14.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 35
EP1 batch: 132
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8562277 V     T = -25 °C: 347.3747252 V
Voltage for Gain 150: T = +20 °C: 390.6545268 V     T = -25 °C: 354.6946612 V
Voltage for Gain 200: T = +20 °C: 394.9709874 V     T = -25 °C: 358.7907449 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.669756627 V-1     T = -25 °C: 4.81393145 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.354053408 V-1     T = -25 °C: 9.86064537 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63681359 V-1     T = -25 °C: 15.77485518 V-1
Break-through voltage: T = +20 °C: 410.4546696 V     T = -25 °C: 373.9987628 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:52:12 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:50 CET jreher Updated box and position via API.
05. Feb 2021 11:04:01 CET jreher Updated box and position via API.
11. Aug 2020 18:00:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:56 CEST jreher Updated APD location via API.
28. Jan 2020 16:12:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:29 CET jreher Updated APD location via API.
27. Nov 2019 19:50:07 CET jreher Updated APD location via API.
25. Nov 2019 17:20:33 CET jreher Updated box and position via API.
30. Aug 2019 11:29:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:32 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:54 CEST Tobias Imported from Hamamatsu datasheet.