RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3103033988 - Archived data from Tue, 11. August 2020 18:00:37 CEST


This is all the information about APD 3103033988. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3103033988
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 390.1 V
Dark current: 24.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 121
Position in Box: 24
EP1 batch: 131
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.8984517 V     T = -25 °C: 354.0885811 V
Voltage for Gain 150: T = +20 °C: 397.7948442 V     T = -25 °C: 361.6869012 V
Voltage for Gain 200: T = +20 °C: 402.169599 V     T = -25 °C: 365.9489213 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.616249971 V-1     T = -25 °C: 4.812410158 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.17182764 V-1     T = -25 °C: 9.617136507 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.33585158 V-1     T = -25 °C: 15.01991585 V-1
Break-through voltage: T = +20 °C: 417.0254387 V     T = -25 °C: 381.1741771 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:59 CET jreher Updated box and position via API.
11. Aug 2020 18:00:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:54 CEST jreher Updated APD location via API.
28. Jan 2020 16:05:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:28 CET jreher Updated APD location via API.
27. Nov 2019 19:50:06 CET jreher Updated APD location via API.
25. Nov 2019 17:20:32 CET jreher Updated box and position via API.
30. Aug 2019 11:28:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:32 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:53 CEST Tobias Imported from Hamamatsu datasheet.