RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3102033922 - Archived data from Tue, 11. August 2020 18:07:35 CEST


This is all the information about APD 3102033922. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3102033922
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 374.7 V
Dark current: 25 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 120
Position in Box: 50
EP1 batch: 130
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.2466894 V     T = -25 °C: 339.6483839 V
Voltage for Gain 150: T = +20 °C: 381.9610057 V     T = -25 °C: 346.7670442 V
Voltage for Gain 200: T = +20 °C: 386.2881505 V     T = -25 °C: 350.7615493 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615818666 V-1     T = -25 °C: 4.86152153 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.074498883 V-1     T = -25 °C: 10.05976603 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0789008 V-1     T = -25 °C: 16.23695387 V-1
Break-through voltage: T = +20 °C: 401.2231402 V     T = -25 °C: 365.1266293 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:55 CET jreher Updated box and position via API.
11. Aug 2020 18:07:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:52 CEST jreher Updated APD location via API.
06. Mar 2020 13:54:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:26 CET jreher Updated APD location via API.
27. Nov 2019 19:49:57 CET jreher Updated APD location via API.
25. Nov 2019 17:20:29 CET jreher Updated box and position via API.
30. Aug 2019 11:25:29 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:23 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:31 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:53 CEST Tobias Imported from Hamamatsu datasheet.