RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3101033868 - Archived data from Fri, 05. February 2021 11:03:52 CET


This is all the information about APD 3101033868. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3101033868
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 17.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 120
Position in Box: 18
EP1 batch: 129
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.1671871 V     T = -25 °C: 353.2011666 V
Voltage for Gain 150: T = +20 °C: 397.0483827 V     T = -25 °C: 360.7455533 V
Voltage for Gain 200: T = +20 °C: 401.4426388 V     T = -25 °C: 364.9711453 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.535605005 V-1     T = -25 °C: 4.80180389 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.885026811 V-1     T = -25 °C: 9.572921255 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.61857938 V-1     T = -25 °C: 14.9421926 V-1
Break-through voltage: T = +20 °C: 416.6125394 V     T = -25 °C: 380.3237363 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:45:55 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:51 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:52 CET jreher Updated box and position via API.
11. Aug 2020 18:07:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:50 CEST jreher Updated APD location via API.
02. Mar 2020 16:45:56 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:24 CET jreher Updated APD location via API.
27. Nov 2019 19:49:54 CET jreher Updated APD location via API.
25. Nov 2019 17:20:27 CET jreher Updated box and position via API.
30. Aug 2019 11:26:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:30 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:53 CEST Tobias Imported from Hamamatsu datasheet.