RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033780 - Archived data from Thu, 15. April 2021 17:01:22 CEST


This is all the information about APD 3009033780. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033780
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 19.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 11
EP1 batch: 128
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1137169 V     T = -25 °C: 349.5234681 V
Voltage for Gain 150: T = +20 °C: 392.9515392 V     T = -25 °C: 356.9301267 V
Voltage for Gain 200: T = +20 °C: 397.3105075 V     T = -25 °C: 361.1021877 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.578286019 V-1     T = -25 °C: 4.700489436 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.070381623 V-1     T = -25 °C: 9.511335843 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08795587 V-1     T = -25 °C: 15.00625805 V-1
Break-through voltage: T = +20 °C: 412.7971623 V     T = -25 °C: 375.9205027 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:34:16 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:22 CEST jreher Updated box and position via API.
05. Feb 2021 11:03:43 CET jreher Updated box and position via API.
11. Aug 2020 18:07:18 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:44 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:47 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:20 CET jreher Updated APD location via API.
27. Nov 2019 19:49:43 CET jreher Updated APD location via API.
25. Nov 2019 17:20:22 CET jreher Updated box and position via API.
30. Aug 2019 11:27:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:12 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
02. Oct 2018 11:28:52 CEST markus.moritz
26. Sep 2018 10:43:14 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.