RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033766 - Archived data from Tue, 11. August 2020 18:07:15 CEST


This is all the information about APD 3009033766. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033766
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 18.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 48
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.469257 V     T = -25 °C: 351.8818659 V
Voltage for Gain 150: T = +20 °C: 394.2873748 V     T = -25 °C: 359.4531533 V
Voltage for Gain 200: T = +20 °C: 398.6289547 V     T = -25 °C: 363.6390683 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.458609814 V-1     T = -25 °C: 5.739876759 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.74464642 V-1     T = -25 °C: 9.27443171 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.39919859 V-1     T = -25 °C: 15.21816591 V-1
Break-through voltage: T = +20 °C: 413.6935095 V     T = -25 °C: 377.0160069 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:40 CET jreher Updated box and position via API.
11. Aug 2020 18:07:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:43 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:46 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:18 CET jreher Updated APD location via API.
27. Nov 2019 19:49:35 CET jreher Updated APD location via API.
25. Nov 2019 17:20:20 CET jreher Updated box and position via API.
30. Aug 2019 11:27:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:07 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.