RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033762 - Archived data from Tue, 11. August 2020 18:07:14 CEST


This is all the information about APD 3009033762. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033762
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.8 V
Dark current: 24 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 45
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.2285581 V     T = -25 °C: 353.4565636 V
Voltage for Gain 150: T = +20 °C: 397.0176286 V     T = -25 °C: 360.9396518 V
Voltage for Gain 200: T = +20 °C: 401.3453332 V     T = -25 °C: 365.1205892 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.551787552 V-1     T = -25 °C: 4.694149498 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.024848578 V-1     T = -25 °C: 9.410550964 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08042238 V-1     T = -25 °C: 14.86711615 V-1
Break-through voltage: T = +20 °C: 415.9223967 V     T = -25 °C: 379.7282363 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:39 CET jreher Updated box and position via API.
11. Aug 2020 18:07:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:43 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:38 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:18 CET jreher Updated APD location via API.
27. Nov 2019 19:49:34 CET jreher Updated APD location via API.
25. Nov 2019 17:20:19 CET jreher Updated box and position via API.
30. Aug 2019 11:27:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:07 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.