RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033759 - Archived data from Wed, 21. April 2021 11:02:30 CEST


This is all the information about APD 3009033759. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033759
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 19.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 42
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.4244961 V     T = -25 °C: 350.7888453 V
Voltage for Gain 150: T = +20 °C: 394.2511512 V     T = -25 °C: 358.261698 V
Voltage for Gain 200: T = +20 °C: 398.5963259 V     T = -25 °C: 362.4691267 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.446289451 V-1     T = -25 °C: 4.928393575 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.769472488 V-1     T = -25 °C: 9.110683957 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31943265 V-1     T = -25 °C: 16.11701142 V-1
Break-through voltage: T = +20 °C: 413.7558172 V     T = -25 °C: 377.5909232 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:40:01 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:30 CEST jreher Updated box and position via API.
05. Feb 2021 11:03:39 CET jreher Updated box and position via API.
11. Aug 2020 18:07:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:43 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:38 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:18 CET jreher Updated APD location via API.
27. Nov 2019 19:49:34 CET jreher Updated APD location via API.
25. Nov 2019 17:20:19 CET jreher Updated box and position via API.
30. Aug 2019 11:27:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.