RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033751 - Archived data from Mon, 17. May 2021 09:17:18 CEST


This is all the information about APD 3009033751. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033751
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 19.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 34
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5397385 V     T = -25 °C: 349.8356402 V
Voltage for Gain 150: T = +20 °C: 393.3557147 V     T = -25 °C: 357.2827649 V
Voltage for Gain 200: T = +20 °C: 397.6902107 V     T = -25 °C: 361.4752474 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43887891 V-1     T = -25 °C: 4.93003661 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.710285638 V-1     T = -25 °C: 9.139691701 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.22497827 V-1     T = -25 °C: 16.24196876 V-1
Break-through voltage: T = +20 °C: 412.4635013 V     T = -25 °C: 376.196797 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:57:21 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:18 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:38 CET jreher Updated box and position via API.
11. Aug 2020 18:07:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:42 CEST jreher Updated APD location via API.
02. Mar 2020 16:21:37 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:17 CET jreher Updated APD location via API.
27. Nov 2019 19:49:33 CET jreher Updated APD location via API.
25. Nov 2019 17:20:19 CET jreher Updated box and position via API.
30. Aug 2019 11:27:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.