RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033721 - Archived data from Fri, 05. February 2021 11:03:36 CET


This is all the information about APD 3008033721. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033721
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 26.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 12
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1166473 V     T = -25 °C: 351.6069267 V
Voltage for Gain 150: T = +20 °C: 394.9581043 V     T = -25 °C: 359.0224105 V
Voltage for Gain 200: T = +20 °C: 399.3158114 V     T = -25 °C: 363.2165134 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.575467281 V-1     T = -25 °C: 4.695579078 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.056529429 V-1     T = -25 °C: 9.369771492 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05605183 V-1     T = -25 °C: 14.72828087 V-1
Break-through voltage: T = +20 °C: 414.0102301 V     T = -25 °C: 377.9407727 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:24:20 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:36 CET jreher Updated box and position via API.
11. Aug 2020 18:07:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:48 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:20 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:19 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:16 CET jreher Updated APD location via API.
27. Nov 2019 19:49:32 CET jreher Updated APD location via API.
25. Nov 2019 17:20:17 CET jreher Updated box and position via API.
30. Aug 2019 11:28:10 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.