RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033716 - Archived data from Tue, 11. August 2020 18:07:07 CEST


This is all the information about APD 3008033716. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033716
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.5 V
Dark current: 21.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 8
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.4684843 V     T = -25 °C: 356.4460592 V
Voltage for Gain 150: T = +20 °C: 400.3512044 V     T = -25 °C: 363.997177 V
Voltage for Gain 200: T = +20 °C: 404.7187821 V     T = -25 °C: 368.233901 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.40538206 V-1     T = -25 °C: 4.895238749 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.581569911 V-1     T = -25 °C: 9.353513029 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98711188 V-1     T = -25 °C: 14.59954048 V-1
Break-through voltage: T = +20 °C: 420.2694035 V     T = -25 °C: 383.8802933 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:35 CET jreher Updated box and position via API.
11. Aug 2020 18:07:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:47 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:19 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:18 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:15 CET jreher Updated APD location via API.
27. Nov 2019 19:49:31 CET jreher Updated APD location via API.
25. Nov 2019 17:20:16 CET jreher Updated box and position via API.
30. Aug 2019 11:28:10 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.