RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3005033484 - Archived data from Fri, 05. February 2021 11:03:12 CET


This is all the information about APD 3005033484. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3005033484
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 18.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 115
Position in Box: 8
EP1 batch: 121
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7272324 V     T = -25 °C: 344.5836708 V
Voltage for Gain 150: T = +20 °C: 387.5518647 V     T = -25 °C: 351.929822 V
Voltage for Gain 200: T = +20 °C: 391.899261 V     T = -25 °C: 356.0444506 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.708125604 V-1     T = -25 °C: 4.724931878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.396081361 V-1     T = -25 °C: 9.606333938 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.6315765 V-1     T = -25 °C: 15.2036204 V-1
Break-through voltage: T = +20 °C: 407.0586297 V     T = -25 °C: 370.8430855 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:05:34 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:36 CET jreher Updated box and position via API.
05. Feb 2021 11:03:12 CET jreher Updated box and position via API.
11. Aug 2020 18:06:47 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:26 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:11 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:04 CET jreher Updated APD location via API.
27. Nov 2019 19:48:58 CET jreher Updated APD location via API.
25. Nov 2019 17:20:02 CET jreher Updated box and position via API.
27. Aug 2019 12:10:15 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:22 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:48 CEST Tobias Imported from Hamamatsu datasheet.