RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3004033428 - Archived data from Tue, 11. August 2020 18:06:38 CEST


This is all the information about APD 3004033428. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3004033428
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.7 V
Dark current: 25.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 114
Position in Box: 15
EP1 batch: 120
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.6671428 V     T = -25 °C: 351.7737786 V
Voltage for Gain 150: T = +20 °C: 395.5028039 V     T = -25 °C: 359.2624315 V
Voltage for Gain 200: T = +20 °C: 399.8368861 V     T = -25 °C: 363.5001538 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.728199782 V-1     T = -25 °C: 4.915206737 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.567172107 V-1     T = -25 °C: 9.253365462 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10431251 V-1     T = -25 °C: 16.06391036 V-1
Break-through voltage: T = +20 °C: 415.1390187 V     T = -25 °C: 378.749407 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:04 CET jreher Updated box and position via API.
11. Aug 2020 18:06:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:22 CEST jreher Updated APD location via API.
25. Feb 2020 16:44:37 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:01 CET jreher Updated APD location via API.
27. Nov 2019 19:48:47 CET jreher Updated APD location via API.
25. Nov 2019 17:19:56 CET jreher Updated box and position via API.
27. Aug 2019 12:10:38 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:20 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.