RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3004033417 - Archived data from Tue, 11. August 2020 18:06:36 CEST


This is all the information about APD 3004033417. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3004033417
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.5 V
Dark current: 20 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 114
Position in Box: 5
EP1 batch: 119
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.092357 V     T = -25 °C: 353.1241139 V
Voltage for Gain 150: T = +20 °C: 396.9384913 V     T = -25 °C: 360.6536551 V
Voltage for Gain 200: T = +20 °C: 401.3082992 V     T = -25 °C: 364.8683807 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.541104853 V-1     T = -25 °C: 4.748664169 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.921915215 V-1     T = -25 °C: 9.561308412 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.63031293 V-1     T = -25 °C: 14.98187915 V-1
Break-through voltage: T = +20 °C: 416.6075171 V     T = -25 °C: 380.2410115 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:16:20 CET oafedulidis Assigned to capsule by script
09. Dec 2021 13:10:41 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:03:03 CET jreher Updated box and position via API.
11. Aug 2020 18:06:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:21 CEST jreher Updated APD location via API.
25. Feb 2020 16:45:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:00 CET jreher Updated APD location via API.
27. Nov 2019 19:48:47 CET jreher Updated APD location via API.
25. Nov 2019 17:19:55 CET jreher Updated box and position via API.
27. Aug 2019 12:10:59 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:20 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.