RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3004033416 - Archived data from Tue, 11. August 2020 18:06:36 CEST


This is all the information about APD 3004033416. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3004033416
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.2 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 114
Position in Box: 4
EP1 batch: 119
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7324632 V     T = -25 °C: 351.7288433 V
Voltage for Gain 150: T = +20 °C: 395.5663585 V     T = -25 °C: 359.2068658 V
Voltage for Gain 200: T = +20 °C: 399.8975771 V     T = -25 °C: 363.4112401 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.694579364 V-1     T = -25 °C: 4.95757348 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.379142589 V-1     T = -25 °C: 9.125452324 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73184297 V-1     T = -25 °C: 16.18961023 V-1
Break-through voltage: T = +20 °C: 414.7332768 V     T = -25 °C: 378.256425 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:03 CET jreher Updated box and position via API.
11. Aug 2020 18:06:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:21 CEST jreher Updated APD location via API.
25. Feb 2020 16:45:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:00 CET jreher Updated APD location via API.
27. Nov 2019 19:48:47 CET jreher Updated APD location via API.
25. Nov 2019 17:19:55 CET jreher Updated box and position via API.
27. Aug 2019 12:10:59 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:20 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.