RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033372 - Archived data from Fri, 18. December 2020 14:01:05 CET


This is all the information about APD 3003033372. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033372
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 19.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 29
EP1 batch: 118
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7060793 V     T = -25 °C: 343.8198703 V
Voltage for Gain 150: T = +20 °C: 386.5209303 V     T = -25 °C: 351.1387947 V
Voltage for Gain 200: T = +20 °C: 390.8686563 V     T = -25 °C: 355.2653567 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.73525883 V-1     T = -25 °C: 5.051967503 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.563531579 V-1     T = -25 °C: 9.417921952 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73658378 V-1     T = -25 °C: 14.86411387 V-1
Break-through voltage: T = +20 °C: 406.7549215 V     T = -25 °C: 370.6988056 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:39:30 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:58 CET jreher Updated box and position via API.
18. Dec 2020 14:01:05 CET jreher Updated box and position via API.
11. Aug 2020 18:06:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:19 CEST jreher Updated APD location via API.
25. Feb 2020 17:04:15 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:58 CET jreher Updated APD location via API.
27. Nov 2019 19:48:37 CET jreher Updated APD location via API.
25. Nov 2019 17:19:52 CET jreher Updated box and position via API.
27. Aug 2019 12:11:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:19 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:47 CEST Tobias Imported from Hamamatsu datasheet.