RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033369 - Archived data from Tue, 16. February 2021 12:27:21 CET


This is all the information about APD 3003033369. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033369
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 21.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 26
EP1 batch: 118
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5252006 V     T = -25 °C: 345.3722449 V
Voltage for Gain 150: T = +20 °C: 388.3482854 V     T = -25 °C: 352.7254935 V
Voltage for Gain 200: T = +20 °C: 392.700993 V     T = -25 °C: 356.8379407 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.432334573 V-1     T = -25 °C: 4.786119227 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.669779402 V-1     T = -25 °C: 9.827176243 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00762783 V-1     T = -25 °C: 15.70910059 V-1
Break-through voltage: T = +20 °C: 407.8785663 V     T = -25 °C: 371.6811611 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:22:20 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:21 CET jreher Updated box and position via API.
05. Feb 2021 11:02:57 CET jreher Updated box and position via API.
11. Aug 2020 18:06:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:18 CEST jreher Updated APD location via API.
25. Feb 2020 17:04:15 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:58 CET jreher Updated APD location via API.
27. Nov 2019 19:48:37 CET jreher Updated APD location via API.
25. Nov 2019 17:19:52 CET jreher Updated box and position via API.
27. Aug 2019 12:11:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:19 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.