RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033337 - Archived data from Tue, 11. August 2020 17:46:50 CEST


This is all the information about APD 3003033337. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033337
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 18.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 112
Position in Box: 48
EP1 batch: 117
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3517444 V     T = -25 °C: 345.160874 V
Voltage for Gain 150: T = +20 °C: 388.1164617 V     T = -25 °C: 352.4893479 V
Voltage for Gain 200: T = +20 °C: 392.4489013 V     T = -25 °C: 356.5852804 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.525327807 V-1     T = -25 °C: 4.899249017 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.921253639 V-1     T = -25 °C: 9.145173936 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.82432292 V-1     T = -25 °C: 16.39944638 V-1
Break-through voltage: T = +20 °C: 407.6421972 V     T = -25 °C: 371.4468517 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:53 CET jreher Updated box and position via API.
11. Aug 2020 17:46:50 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:03:13 CET jreher Updated APD location via API.
29. Nov 2019 11:46:56 CET jreher Updated APD location via API.
27. Nov 2019 19:48:28 CET jreher Updated APD location via API.
25. Nov 2019 17:19:49 CET jreher Updated box and position via API.
25. Nov 2019 14:20:15 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:17:53 CET spankonin Updated APD batch assignment via API.
27. Aug 2019 12:11:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:18 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.