RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0805007535 - Archived data from Tue, 11. August 2020 17:57:10 CEST


This is all the information about APD 0805007535. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0805007535
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.9 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 83
Position in grid: 16
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 389.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.4686372 V     T = -25 °C: 353.4254104 V
Voltage for Gain 150: T = +20 °C: 397.3550158 V     T = -25 °C: 361.0319066 V
Voltage for Gain 200: T = +20 °C: 401.7232735 V     T = -25 °C: 365.3017385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429175321 V-1     T = -25 °C: 4.62411 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.65714294 V-1     T = -25 °C: 9.210710598 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.0700076 V-1     T = -25 °C: 14.33679683 V-1
Break-through voltage: T = +20 °C: 416.627546 V     T = -25 °C: 380.7403126 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:00 CET jreher Updated box and position via API.
11. Aug 2020 17:57:10 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:55 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:45 CEST jreher Updated box and position via API.
19. Dec 2019 15:52:02 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:50 CET jreher Updated box and position via API.
23. Aug 2017 16:06:39 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:30:05 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:56:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:51:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:18 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:31 CEST Tobias Imported from Hamamatsu datasheet.