Show Hamamatsu Avalanche Photo Diode 2904032724 - Archived data from Thu, 28. November 2019 12:12:52 CET
This is all the information about APD 2904032724. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2904032724 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | F04 |
| Break-through voltage: | 411 V |
| Voltage for Gain 100 (T=+25°C): | 382.6 V |
| Dark current: | 5.1 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 110 |
| Position in Box: | 8 |
| EP1 batch: | 113 |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | none |
| Sent for analysis after irradiation: | none |
| Return for assembly: | none |
| Irradiation: | |
| Date: | none |
| Dose used: | none |
| Temperature: | none |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | none |
| Temperature: | none |
| Duration: | none |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 17. Jun 2021 19:04:18 CEST | oafedulidis | Assigned to capsule by script |
| 16. Feb 2021 12:27:28 CET | jreher | Updated box and position via API. |
| 05. Feb 2021 11:02:32 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 18:00:24 CEST | jreher | Updated APD characteristics via API. |
| 11. Aug 2020 17:49:12 CEST | jreher | Updated APD location via API. |
| 28. Jan 2020 16:01:09 CET | spankonin | Updated APD batch assignment via API. |
| 29. Nov 2019 11:46:45 CET | jreher | Updated APD location via API. |
| 28. Nov 2019 12:12:52 CET | jreher | Updated box and position via API. |
| 28. Nov 2019 12:01:21 CET | jreher | Updated APD location via API. |
| 23. Aug 2019 12:01:50 CEST | jgrochowski | Updated APD batch assignment via API. |
| 05. Jul 2019 13:50:05 CEST | jreher | Updated APD location via API. |
| 03. Jan 2019 00:14:14 CET | Tobias | Corrected dark current unit. |
| 06. Jul 2018 22:38:43 CEST | Tobias | Imported from Hamamatsu datasheet. |