RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032714 - Archived data from Tue, 11. August 2020 18:00:23 CEST


This is all the information about APD 2904032714. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032714
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 49
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4372954 V     T = -25 °C: 345.9419334 V
Voltage for Gain 150: T = +20 °C: 389.2857608 V     T = -25 °C: 353.3265555 V
Voltage for Gain 200: T = +20 °C: 393.6535795 V     T = -25 °C: 357.4648643 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.436893974 V-1     T = -25 °C: 4.919854293 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.674242417 V-1     T = -25 °C: 9.121823209 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09252618 V-1     T = -25 °C: 16.27177146 V-1
Break-through voltage: T = +20 °C: 409.476536 V     T = -25 °C: 372.985588 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:28 CET jreher Updated box and position via API.
11. Aug 2020 18:00:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:11 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:45 CET jreher Updated APD location via API.
28. Nov 2019 12:01:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:39 CET jreher Updated box and position via API.
23. Aug 2019 12:01:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.