RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032688 - Archived data from Tue, 11. August 2020 18:00:18 CEST


This is all the information about APD 2904032688. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032688
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 26
EP1 batch: 112
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5460382 V     T = -25 °C: 346.8297338 V
Voltage for Gain 150: T = +20 °C: 390.4085483 V     T = -25 °C: 354.2354437 V
Voltage for Gain 200: T = +20 °C: 394.7649389 V     T = -25 °C: 358.3931974 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.417566886 V-1     T = -25 °C: 4.973606045 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.62094555 V-1     T = -25 °C: 9.23816231 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.0242537 V-1     T = -25 °C: 14.59088121 V-1
Break-through voltage: T = +20 °C: 410.4290877 V     T = -25 °C: 373.8881592 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:24:59 CET jreher Updated box and position via API.
15. Feb 2021 15:37:13 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:25 CET jreher Updated box and position via API.
11. Aug 2020 18:00:18 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:09 CEST jreher Updated APD location via API.
28. Jan 2020 15:48:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:43 CET jreher Updated APD location via API.
28. Nov 2019 12:01:18 CET jreher Updated APD location via API.
25. Nov 2019 17:19:36 CET jreher Updated box and position via API.
23. Aug 2019 12:00:21 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:13 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.