Show Hamamatsu Avalanche Photo Diode 2904032678 - Archived data from Mon, 15. February 2021 15:40:01 CET


This is all the information about APD 2904032678. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032678
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2904032678/3101033852
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 16.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 109
Position in Box: 17
EP1 batch: 112
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.287296 V     T = -25 °C: 347.869233 V
Voltage for Gain 150: T = +20 °C: 391.1025288 V     T = -25 °C: 355.2083474 V
Voltage for Gain 200: T = +20 °C: 395.4424974 V     T = -25 °C: 359.3163032 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581349881 V-1     T = -25 °C: 5.037959206 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.044151125 V-1     T = -25 °C: 9.485259431 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18065276 V-1     T = -25 °C: 15.13051185 V-1
Break-through voltage: T = +20 °C: 410.2836719 V     T = -25 °C: 374.0359741 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:44 CET jreher Updated box and position via API.
15. Feb 2021 15:40:01 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:24 CET jreher Updated box and position via API.
11. Aug 2020 18:00:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:08 CEST jreher Updated APD location via API.
28. Jan 2020 15:48:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:42 CET jreher Updated APD location via API.
28. Nov 2019 12:01:18 CET jreher Updated APD location via API.
25. Nov 2019 17:19:36 CET jreher Updated box and position via API.
23. Aug 2019 12:00:21 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:13 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.