RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032642 - Archived data from Tue, 11. August 2020 18:06:21 CEST


This is all the information about APD 2903032642. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032642
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 38
EP1 batch: 111
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5651592 V     T = -25 °C: 349.7253883 V
Voltage for Gain 150: T = +20 °C: 393.4317021 V     T = -25 °C: 357.1810849 V
Voltage for Gain 200: T = +20 °C: 397.7864646 V     T = -25 °C: 361.3717103 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.415483992 V-1     T = -25 °C: 4.989615415 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.609463706 V-1     T = -25 °C: 9.202993328 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00979735 V-1     T = -25 °C: 14.45277387 V-1
Break-through voltage: T = +20 °C: 412.0271063 V     T = -25 °C: 375.8094009 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:19 CET jreher Updated box and position via API.
11. Aug 2020 18:06:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:05 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:40 CET jreher Updated APD location via API.
28. Nov 2019 12:01:16 CET jreher Updated APD location via API.
25. Nov 2019 17:19:33 CET jreher Updated box and position via API.
23. Aug 2019 12:00:03 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:12 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.