RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032632 - Archived data from Fri, 05. February 2021 11:02:18 CET


This is all the information about APD 2903032632. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032632
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 29
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.5748057 V     T = -25 °C: 352.5171848 V
Voltage for Gain 150: T = +20 °C: 396.4103264 V     T = -25 °C: 360.0259227 V
Voltage for Gain 200: T = +20 °C: 400.7471646 V     T = -25 °C: 364.2320841 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.433725847 V-1     T = -25 °C: 4.651193767 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.719808159 V-1     T = -25 °C: 9.365450764 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2333385 V-1     T = -25 °C: 14.70213332 V-1
Break-through voltage: T = +20 °C: 415.1835078 V     T = -25 °C: 378.9343323 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:30:54 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:53 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:18 CET jreher Updated box and position via API.
11. Aug 2020 18:06:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:04 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:39 CET jreher Updated APD location via API.
28. Nov 2019 12:01:15 CET jreher Updated APD location via API.
25. Nov 2019 17:19:32 CET jreher Updated box and position via API.
23. Aug 2019 11:59:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:12 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.