RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032627 - Archived data from Tue, 11. August 2020 18:06:13 CEST


This is all the information about APD 2903032627. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032627
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 27
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5125962 V     T = -25 °C: 347.8622228 V
Voltage for Gain 150: T = +20 °C: 391.3468683 V     T = -25 °C: 355.2718556 V
Voltage for Gain 200: T = +20 °C: 395.6915707 V     T = -25 °C: 359.4298838 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441932638 V-1     T = -25 °C: 4.947789996 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.666406866 V-1     T = -25 °C: 9.179242516 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.20406486 V-1     T = -25 °C: 16.37756049 V-1
Break-through voltage: T = +20 °C: 410.2214365 V     T = -25 °C: 374.114354 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:18 CET jreher Updated box and position via API.
11. Aug 2020 18:06:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:04 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:39 CET jreher Updated APD location via API.
28. Nov 2019 12:01:15 CET jreher Updated APD location via API.
25. Nov 2019 17:19:32 CET jreher Updated box and position via API.
23. Aug 2019 11:59:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.