RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032625 - Archived data from Tue, 11. August 2020 18:06:12 CEST


This is all the information about APD 2903032625. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032625
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 25
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9727291 V     T = -25 °C: 344.587263 V
Voltage for Gain 150: T = +20 °C: 387.7965104 V     T = -25 °C: 351.9285381 V
Voltage for Gain 200: T = +20 °C: 392.1574337 V     T = -25 °C: 356.050756 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.663114188 V-1     T = -25 °C: 4.721304051 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.184133503 V-1     T = -25 °C: 9.615676835 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28400962 V-1     T = -25 °C: 15.2745367 V-1
Break-through voltage: T = +20 °C: 407.9261206 V     T = -25 °C: 371.4414333 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:05:32 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:36 CET jreher Updated box and position via API.
05. Feb 2021 11:02:18 CET jreher Updated box and position via API.
11. Aug 2020 18:06:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:04 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:04 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:39 CET jreher Updated APD location via API.
28. Nov 2019 12:01:15 CET jreher Updated APD location via API.
25. Nov 2019 17:19:32 CET jreher Updated box and position via API.
23. Aug 2019 11:59:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.