RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032588 - Archived data from Tue, 11. August 2020 18:06:06 CEST


This is all the information about APD 2902032588. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032588
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.1 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 10
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.163241 V     T = -25 °C: 350.9792497 V
Voltage for Gain 150: T = +20 °C: 395.0531845 V     T = -25 °C: 358.5216297 V
Voltage for Gain 200: T = +20 °C: 399.4418088 V     T = -25 °C: 362.738961 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.512710775 V-1     T = -25 °C: 4.811337337 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.8399239 V-1     T = -25 °C: 8.812239868 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42230412 V-1     T = -25 °C: 15.3508831 V-1
Break-through voltage: T = +20 °C: 413.760633 V     T = -25 °C: 377.3603209 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:40:25 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:11 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:16 CET jreher Updated box and position via API.
11. Aug 2020 18:06:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:03 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:13 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:38 CET jreher Updated APD location via API.
28. Nov 2019 12:01:14 CET jreher Updated APD location via API.
25. Nov 2019 17:19:31 CET jreher Updated box and position via API.
23. Aug 2019 11:59:45 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:57 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:40 CEST Tobias Imported from Hamamatsu datasheet.