RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032581 - Archived data from Fri, 05. February 2021 11:02:15 CET


This is all the information about APD 2902032581. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032581
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.8 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 5
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2692761 V     T = -25 °C: 351.2751203 V
Voltage for Gain 150: T = +20 °C: 395.1429091 V     T = -25 °C: 358.7829018 V
Voltage for Gain 200: T = +20 °C: 399.516147 V     T = -25 °C: 362.9832399 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472784758 V-1     T = -25 °C: 4.725781326 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.796322237 V-1     T = -25 °C: 9.50623953 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41471027 V-1     T = -25 °C: 15.04311581 V-1
Break-through voltage: T = +20 °C: 414.9634824 V     T = -25 °C: 378.4320659 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:53:14 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:58 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:15 CET jreher Updated box and position via API.
11. Aug 2020 18:06:03 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:02 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:13 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:38 CET jreher Updated APD location via API.
28. Nov 2019 12:01:13 CET jreher Updated APD location via API.
25. Nov 2019 17:19:30 CET jreher Updated box and position via API.
23. Aug 2019 11:59:45 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:40 CEST Tobias Imported from Hamamatsu datasheet.