RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031396 - Archived data from Fri, 05. February 2021 11:05:29 CET


This is all the information about APD 2808031396. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031396
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 10 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 133
Position in Box: 11
EP1 batch: 151
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4483447 V     T = -25 °C: 347.7786545 V
Voltage for Gain 150: T = +20 °C: 391.2639418 V     T = -25 °C: 355.1623284 V
Voltage for Gain 200: T = +20 °C: 395.6037422 V     T = -25 °C: 359.307484 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.465156799 V-1     T = -25 °C: 4.986544536 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.750166231 V-1     T = -25 °C: 9.305192824 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32237545 V-1     T = -25 °C: 14.6251821 V-1
Break-through voltage: T = +20 °C: 409.9914661 V     T = -25 °C: 374.3516569 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:43 CET jreher Updated box and position via API.
15. Feb 2021 15:40:04 CET jreher Assigned to capsule by script
05. Feb 2021 11:05:29 CET jreher Updated box and position via API.
11. Aug 2020 18:01:04 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:48 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:49 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:12 CET jreher Updated APD location via API.
27. Nov 2019 19:52:17 CET jreher Updated APD location via API.
25. Nov 2019 17:21:28 CET jreher Updated box and position via API.
17. Sep 2019 12:06:14 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:10 CET Tobias Corrected dark current unit.
05. Jul 2018 14:27:55 CEST Tobias Imported from Hamamatsu datasheet.