RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031394 - Archived data from Tue, 11. August 2020 18:01:03 CEST


This is all the information about APD 2808031394. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031394
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 41
EP1 batch: 151
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.6515621 V     T = -25 °C: 351.6604089 V
Voltage for Gain 150: T = +20 °C: 395.4243821 V     T = -25 °C: 359.0452548 V
Voltage for Gain 200: T = +20 °C: 399.7169932 V     T = -25 °C: 363.1636454 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.40368896 V-1     T = -25 °C: 4.679465477 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.712011392 V-1     T = -25 °C: 9.452847418 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.27881399 V-1     T = -25 °C: 15.08301899 V-1
Break-through voltage: T = +20 °C: 413.5096676 V     T = -25 °C: 377.1132616 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:05:29 CET jreher Updated box and position via API.
11. Aug 2020 18:01:03 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:48 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:49 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:12 CET jreher Updated APD location via API.
27. Nov 2019 19:52:17 CET jreher Updated APD location via API.
25. Nov 2019 17:21:28 CET jreher Updated box and position via API.
17. Sep 2019 12:06:14 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:10 CET Tobias Corrected dark current unit.
05. Jul 2018 14:27:55 CEST Tobias Imported from Hamamatsu datasheet.