RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031386 - Archived data from Fri, 05. February 2021 11:05:28 CET


This is all the information about APD 2808031386. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031386
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 35
EP1 batch: 150
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5431225 V     T = -25 °C: 347.7084415 V
Voltage for Gain 150: T = +20 °C: 391.3133345 V     T = -25 °C: 355.0331044 V
Voltage for Gain 200: T = +20 °C: 395.6263223 V     T = -25 °C: 359.1311985 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.47438544 V-1     T = -25 °C: 4.697311908 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.798390467 V-1     T = -25 °C: 9.563938267 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.53597818 V-1     T = -25 °C: 15.25878566 V-1
Break-through voltage: T = +20 °C: 410.7880023 V     T = -25 °C: 374.049437 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:05:28 CET jreher Updated box and position via API.
11. Aug 2020 18:01:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:47 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:49 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:11 CET jreher Updated APD location via API.
27. Nov 2019 19:52:16 CET jreher Updated APD location via API.
25. Nov 2019 17:21:28 CET jreher Updated box and position via API.
17. Sep 2019 12:04:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:10 CET Tobias Corrected dark current unit.
05. Jul 2018 14:27:55 CEST Tobias Imported from Hamamatsu datasheet.